The Partner You Trust; The Equipment You Want

24/7 Availability

Call: (800) 397-6246

Used Sales Cart (0)

You have no items in your Used Sales cart.

Recommended Products

Astera AX-2 100 Bar 1 Meter

Astera

AX-2 100 Bar 1 Meter

$4,960

$5,695

Save $735
Chauvet onAir Panel 2 IP LED Soft Light

Chauvet

onAir Panel 2

$1,370

$1,795

Save $425
Used Ayrton Diablo

Ayrton Digital Lighting

Diablo-S

$4,740

$5,495

Save $755
ECL Fresnel Rental Image

Pro Lights

EclFresnel CT+M

$2,670

$2,995

Save $325
Used Elation Fuze Max Profile

Elation

Fuze Max Profile

$2,990

$4,795

Save $1,805
ETC Halcyon Titanium

High End Systems

ETC Halcyon Titanium

$4,960

$5,995

Save $1,035

Estimated Total:

TBD

Rentals Quote (0)

The following items are for rental only, they are not for sale.

Estimated Total:

TBD

Once your rental quote is requested, a representative will contact you to discuss availability, pricing, shipping method and costs.

Rentals

Main Light Supports We Chose to Go to the Moon at Carnegie Hall

November 23rd 2026

Main Light supplied the lighting equipment for We Chose to Go to the Moon, a special theatrical concert and “living documentary” recorded at New York’s Carnegie Hall and broadcast on PBS, PBS.org, and the PBS App on November 10, 2026, ahead of Veterans Day.

Created and narrated by writer and historian John Monsky, produced for television by RadicalMedia, and directed for the stage by Michael Mayer, the production explored America’s race to the moon through the stories of astronauts, engineers, and their families. A 45-piece Orchestra of St. Luke’s and six Broadway vocalists provided a soundtrack inspired by the music of the era.

Lighting Designer Mike Baldassari designed the production for both the live audience and a multi-camera television capture, working closely with Director of Photography Declan Quinn. Main Light supplied a Robe-centered lighting package that included FORTE fixtures, T2 Profiles, iFORTE LTX Follow Spots, and the RoboSpot remote follow spot system. The FORTE and T2 fixtures were carefully color-matched during three days of pre-visualization to maintain consistent key light and color across the production.

The lighting team also had to work within Carnegie Hall’s historic architecture and weight restrictions while integrating extensive projection and other visual storytelling elements. The production schedule added another challenge, with the load-in beginning at midnight on the same day the first performance was recorded. Working alongside Baldassari were Lighting Director Mitch Fenton, Moving Light Programmer Jason Marin, and Theatrical Gaffer Sarah Arnold.

For a production balancing Carnegie Hall’s historic architecture, a large ensemble, extensive projection, and the demands of a multi-camera television capture on an exceptionally tight schedule, the lighting system had to deliver both precision and consistency. Main Light supplied the lighting equipment that helped Baldassari and the production team translate that ambitious design from preparation to the recorded performances.

Photo Credits: Fadi Kheir, Nina Westervelt

Full Article: ROBE – Robe Goes to the Moon

About Main Light

Main Light stands at the forefront of the entertainment technology industry, offering rentals and used sales of consoles, lighting, truss, and more. With three strategic locations across the U.S., Main Light combines the resources of a national provider with the attentive service of a local partner.

Main Light, Tri-State

100 Central Ave, Teterboro, NJ 07608

Main Light, East

1614 Newport Gap Pike, Wilmington, DE 19808

Main Light, West

6435 South Valley View Blvd., Suite C, Las Vegas, NV 89118

For more information, visit MainLight.com.

Similar Articles